In the Extreme Programming practice of continuous testing, what type of test is used by the client to check that each expected feature of the overall product works as specified?

Practice More Questions From: Course Final Assessment (Graded)

Q:

Every process is organized into distinct phases. What is a phase organized into?

Q:

In general, what are the smallest manageable units of work to do within a process?

Q:

What is the term to describe a sequence of phases outlining the structure of work to create a software product?

Q:

Which one of the following statements is true?

Q:

What are examples of resources needed to make a software product?

Q:

What are examples of roles played by people for a software product?

Q:

As defined and depicted in the course, which one of the following statements is true?

Q:

From the course, which two of the following statements is true?

Q:

From the course, what are examples of specification activities?

Q:

From the course, in which phase would an activity to conduct reviews and audits upon the product occur?

Q:

Which one of the following process models is not an example of a linear process model?

Q:

Which two of the following statements are not true of the Waterfall software process model?

Q:

Unlike Waterfall and V, what does the Sawtooth software process model further allow?

Q:

In the Spiral software process model, what is the correct order of quadrants or phases in each iteration?

Q:

The Unified software process model is iterative because of which of the following reason(s)? (Choose two that are correct)

Q:

In the Unified software process model, requirements are conceived in the ___ phase and further refined in the ___ phase.

Q:

In incremental prototyping, the product is built up by adding successive increments. What kinds of features get done in the successive increments?

Q:

Continuous delivery mainly aims to achieve _______________ by the end of each iteration?

Q:

Which of the following statements is not an outcome of the planning game in Extreme Programming that involves the client and development team?

Q:

A specific Extreme Programming practice is to have a system ___, so that the product intent or design can be easily explained to others.

Q:

Which one of the following upholds the Extreme Programming practice of simple design?

Q:

Which of the following statements is true about the Extreme Programming practice of continuous testing?

Q:

In the Extreme Programming practice of continuous testing, what type of test is used by the client to check that each expected feature of the overall product works as specified?

Q:

In the Extreme Programming practice of pair programming, which two of the following statements is true?

Q:

In Scrum, the project timeline is divided into fixed-length time boxes known as ___, with each typically lasting ___.

Q:

In Scrum, the ___ is responsible for ___ on the product backlog.

Q:

In Scrum, who can make changes to the requirements on the product backlog?

Q:

What are two scrum events that are facilitated by a scrum master?

Q:

How can waste arise in software development? (Choose two that are correct)

Q:

In Lean software development, how can amplifying learning occur? (Choose two that are correct)

Q:

In Lean software development, what does the principle of deciding as late as possible mean?

Q:

In Lean software development, what does the principle of delivering as fast as possible mean? (Choose three that are correct)

Q:

In Lean software development, what does building quality or integrity in mean? (Choose two that are correct)

Q:

In Lean software development, what does seeing the whole mean? (Choose two that are correct)

Q:

In Kanban, the columns on the board represent ___.

Q:

Following Scrum and Kanban, for a small feature development task, what should the done column signify?

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments